East-west line to be built 1st in Ottawa's rapid transit network
Last Updated: Thursday, September 11, 2008 | 2:24 PM ET
CBC News
Related
Internal Links
- Maps showing the four scenarios for Phase 1 in order (.pdf)
- Ottawa committee endorses light rail plan with eye to expansion
- $4B light rail option endorsed by Ottawa staff
- Ottawa unveils options for new transit plan with tunnel
- Ottawa council approves new transit plan
- Ottawa city committee passes new light rail plan
- Region-wide LRT plan unveiled by task force
- Ottawa council kills light rail project
External Links
(Note: CBC does not endorse and is not responsible for the content of external sites - links will open in new window)
The preferred plan for the first construction phase follows the same east-west and north-south routes as the previous light-rail project cancelled in 2006. (City of Ottawa)The first section of Ottawa's proposed rapid transit network to be built will include, at minimum, an east-west rail line connecting the city's downtown with its east end.
The city unveiled four possible scenarios for the first phase of the light rail network Thursday, all including a tunnel through downtown. The scenarios are:
- An east-west line connecting Blair station in the east with Tunney's Pasture, just west of downtown, which would cost $1.9 billion.
- An east-west line connecting St. Laurent in the east with Baseline station in the west, which would cost $2.3 billion.
- An east-west line connecting Blair station with Tunney's Pasture and a north-south line connecting Riverside South with Bayview station, the current northern terminus of the O-train, at a cost of $2.6 billion.
- An east-west line connecting Blair station in the east with Baseline station in the west, costing $2.4 billion.
Same route as cancelled plan
Mayor Larry O'Brien and the chairs of the city's environment, transit and transportation committees have all expressed a preference for the third option, which follows the same route as the light rail plan cancelled by a council vote in 2006.
Alta Vista Coun. Peter Hume, chair of the city's planning and environment committee, said the north-south line would help guide development in the city's south end.
Nancy Schepers, deputy city manager of planning, transit and the environment, said that would make the route easier to implement.
However, it also makes the route unpopular with some councillors. Council voted 13-11 in December 2006, following the November municipal election, to scrap the original $778-million light rail contract approved by the previous council in July.
Kanata North Coun. Marianne Wilkinson said the north-south line in the previous plan didn't work.
"And if people find out that they're just putting back what we cancelled before, I think that there's going to be a lot of very unhappy people in this city."
Schepers said Scenario 2 and Scenario 4 would both be difficult, as they would require negotiations with the National Capital Commission to put rails on the Ottawa River Parkway.
There are to be five public consultation sessions on the scenarios between Sept. 11 and 22. People can register via the City of Ottawa's transportation master plan website.
Share Tools
Top News Headlines
- Outrage grows over Syria killings
- The deaths in Syria of over 90 people, including at least 32 children, has sparked international outrage and raised fears that the international peace plan is in tatters. more »
- Montreal protesters march in peaceful defiance
- The clanging of pots and pans sounded throughout Montreal's downtown core Saturday night and into early Sunday morning, as thousands of protesters marched on in peaceful — but loud — defiance of Bill 78. more »
- Quebec tornadoes cause millions in damage
- Environment Canada confirms that two tornadoes — one of which was classed as a moderate F-1 packing winds of up to 150 km/h — touched down near Montreal Friday night, causing millions of dollars in damage. more »
- Teen struck by lightning in Ottawa dies
- The victim of a Friday lightning strike during a storm in east Ottawa has died, CBC News has learned. more »
- Teen struck by lightning in Ottawa dies
- Missing Winnipeg children found in Mexico
- Quebec tornadoes cause millions in damage
- Montreal protesters march in peaceful defiance
- Woman's remains found in hockey bag on Cape Breton river
- Outrage grows over Syria killings
- Pope's butler arrested in Vatican leaks scandal
- Everest team unable to bring down Toronto woman's body
- WWE apologizes to Brazil over Canadian's flag stomp
